When a roof is beyond repair, we strip it to the rafters and rebuild it with a breathable membrane, new treated battens, new tiles and a dry ridge and verge system.
4.8 from 71 Google reviews (opens in a new tab)
Re-roofing more than a quarter of a roof falls under the Building Regulations. As CompetentRoofer members we self-certify the work and you receive the certificate, with no separate building control fee. Where it is practical, we also bring the loft insulation up to current standards at the same time.
Lee runs every re-roof from scaffold to sign-off. We sheet the roof at the end of each day, check the timbers once it is stripped and tell you straight away if any need replacing.
Lets the loft ventilate and keeps driven rain out.
Mechanically fixed, so no mortar to crack and fall.
Self-certified through CompetentRoofer and posted to you.
Rafters inspected once the roof is stripped.
Sheeted down at the end of each day.
Erected, inspected and removed in the price.

Hemel Hempstead
A worn concrete tile roof in Leverstock Green was stripped and re-tiled with a new membrane, battens, dry hip and ridge, and new fascias and gutters. Finished in seven working days.
Read about the jobReviews from our Google profile, shown as written, newest first.
Shown exactly as written on Google. We reply to every review, good or bad.
Read every review See us on Google (opens in a new tab)Straight answers on price, timing and guarantees. If your question is not here, call the office.
Repeated leaks, many slipped tiles, sagging, or felt that has turned brittle under the tiles are the usual signs. We will tell you honestly if a repair will do.
Bats are protected. If we find signs of them, work stops until an ecologist has advised, and we will help you arrange that.
Call the office, or send a few details and a photo of the roof and we will call you back to arrange a survey.
01632 960 643We reply within one working hour, Monday to Saturday.
Monday to Friday 7:30–17:30
Saturday 8:00–12:00