Outside, preparation is everything. We wash down, treat, repair and prime before we paint, and we only work when the weather allows.
4.9 from 71 Google reviews (opens in a new tab)
We clean the walls and treat any mould or algae, rake out and fill cracks in render and replace soft timber on sills and fascias with resin repairs or new wood. Bare timber is primed the same day so it does not take on moisture.
Masonry is finished in a breathable, weather-resistant masonry paint; timber in a microporous exterior paint or stain. We arrange scaffold or a tower where needed and include it in the price.
Mould and algae killed before any paint goes on.
Soft sills and fascias resin-repaired or replaced.
Scaffold or tower arranged and priced in the quote.
Reviews from our Google profile, shown as written, newest first.
Shown exactly as written on Google. We reply to every review, good or bad.
Read every review See us on Google (opens in a new tab)Straight answers on price, timing, paint and preparation. If your question is not here, call the office.
From April to September, on dry days above about eight degrees. We book exteriors from spring and keep a flexible schedule around the weather.
With proper preparation, masonry paint usually lasts eight to ten years and exterior woodwork five to seven.
Call the office, or send a few details and we will call you back to arrange a free visit and quote.
01632 960 268We reply within one working day, Monday to Saturday.
Monday to Friday 8:00–17:30
Saturday 9:00–12:00