Kitchens, hallways and open-plan floors in porcelain, natural stone and wood-effect tiles. We level the floor first, then lay the tiles flat and true.
5.0 from 49 Google reviews (opens in a new tab)
Concrete floors are checked and levelled with a self-levelling compound where needed. Anhydrite screeds, common in new extensions, are sanded and primed first, because cement adhesives can fail on them otherwise. Large-format tiles are back-buttered and laid with a levelling clip system so the edges sit flush.
Herringbone floors are set out from the centre line of the room so the pattern runs straight through doorways. Hannah leads our herringbone and patterned floors.
Self-levelling compound where the floor needs it.
For concrete, timber and anhydrite screeds.
Back-buttered and clipped so edges sit flush.
Reviews from our Google profile, shown as written, newest first.
Shown exactly as written on Google. We reply to every review, good or bad.
Read every review See us on Google (opens in a new tab)Straight answers on price, timing and guarantees. If your question is not here, call the office.
Yes. We tile over wet and electric systems regularly, using a flexible adhesive and following the heating manufacturer's warm-up guidance.
Usually after 24 hours, and full use after about three days, depending on the adhesive and grout.
Call the office, or send a few details and photos of the room and we will call you back to arrange a visit.
01632 960 795We reply within one working day, Monday to Saturday.
Monday to Friday 8:00–17:30
Saturday 9:00–13:00