LEDGERLINE Quote

Scaffolding · Hemel Hempstead · Est. 2009

Scaffold that goes up right.

Designed before it is erected. Torqued, tagged and inspected every seven days. Domestic, roofing and commercial access across Hertfordshire.

Scroll to erect

01 / SET OUT

Plates down, plan first.

Base plates on sole boards, levelled before a single tube goes up. Every standard sits on a layout we drew before we arrived.

02 / FRAME

Standards, ledgers, transoms.

2.4 m bays, 2.0 m lifts, every joint a torqued coupler. The frame goes up first and nothing is rushed.

03 / DECK

Boarded, railed, braced.

Fully boarded lifts, guard rails at 950 mm, toe boards at 150, facade braces tying the frame into one stiff triangle.

04 / INSPECT

A named person signs every lift.

A competent person checks the scaffold before use and again at least every seven days. The tag on the ladder is the proof.

05 / HANDOVER

Ready for the trades.

Twenty metres, six storeys, struck cleanly when they are done. Tell us your building and we will draw yours.

Get a quote

/ 01 SERVICES

Six ways we get you up.

/ 02 SPEC SHEET

Numbers we don't round.

The same tube, the same bay, the same torque on every job. You can check any of it with a tape and a spanner.

TUBE
Ø48.3 × 3.2 mm
galvanised steel
BAY LENGTH
2.4 m
standard
LIFT HEIGHT
2.0 m
to next ledger
BOARDS
38 × 225 mm
four per platform
GUARD RAIL
950 mm
with mid rail
TOE BOARD
150 mm
every working lift
COUPLER TORQUE
50 N·m
checked at inspection
PLATFORM LOAD
Class 3
2.0 kN/m²
INSPECTION
≤ 7 days
tagged and dated
2009first tube up
1,400+scaffolds erected
7days, longest gap between inspections
24hto a written quote

/ 03 PROCESS

Five steps, in order.

  1. 1

    Survey

    We visit, measure and photograph. Ground, access, services, neighbours.

  2. 2

    Design

    Drawing and load schedule. Ties located. You approve the price and the plan.

  3. 3

    Erect

    A trained crew, a tagged kit and a set-out line. Usually one to three days.

  4. 4

    Inspect

    Handover inspection, then at least every seven days and after any bad weather.

  5. 5

    Strike

    Dismantled lift by lift, tubes counted back onto the lorry, site left swept.

A brutalist concrete office block wrapped in steel tube scaffold at dusk

/ 04 CASE FILE 0217

Aldwick Exchange: nine lifts of facade in four days.

A 1960s telephone exchange, concrete repairs on every elevation, and a town centre that had to keep moving. Read how we drew it, built it and struck it.

Open the case file

/ 05 QUOTE

Tell us the building. We'll draw the rest.

A written quote inside 24 hours. For anything over three storeys we will visit first.

01632 960431
hello@ledgerline.example
Hemel Hempstead, Hertfordshire