01 / SET OUT
Plates down, plan first.
Base plates on sole boards, levelled before a single tube goes up. Every standard sits on a layout we drew before we arrived.
Scaffolding · Hemel Hempstead · Est. 2009
Designed before it is erected. Torqued, tagged and inspected every seven days. Domestic, roofing and commercial access across Hertfordshire.
Scroll to erect
01 / SET OUT
Base plates on sole boards, levelled before a single tube goes up. Every standard sits on a layout we drew before we arrived.
02 / FRAME
2.4 m bays, 2.0 m lifts, every joint a torqued coupler. The frame goes up first and nothing is rushed.
03 / DECK
Fully boarded lifts, guard rails at 950 mm, toe boards at 150, facade braces tying the frame into one stiff triangle.
04 / INSPECT
A competent person checks the scaffold before use and again at least every seven days. The tag on the ladder is the proof.
05 / HANDOVER
Twenty metres, six storeys, struck cleanly when they are done. Tell us your building and we will draw yours.
Get a quote/ 01 SERVICES
Full house, side and gable scaffolds for re-rendering, windows, fascias and repairs. Usually up in a day.
Edge protection, scaffold roofs and chimney lifts with debris netting. Roofers stay safe, the neighbours stay dry.
Shopfronts, offices and flats. Loading bays, pedestrian gantries and drawings your building control will accept.
Sheeted clear-span roofs so the job keeps moving in January and the interior stays dry.
Interior birdcage scaffolds for ceilings and stairwells, mobile towers for lighter work.
Temporary edge protection, hoardings and fan guards for new builds and demolition.
/ 02 SPEC SHEET
The same tube, the same bay, the same torque on every job. You can check any of it with a tape and a spanner.
/ 03 PROCESS
We visit, measure and photograph. Ground, access, services, neighbours.
Drawing and load schedule. Ties located. You approve the price and the plan.
A trained crew, a tagged kit and a set-out line. Usually one to three days.
Handover inspection, then at least every seven days and after any bad weather.
Dismantled lift by lift, tubes counted back onto the lorry, site left swept.

/ 04 CASE FILE 0217
A 1960s telephone exchange, concrete repairs on every elevation, and a town centre that had to keep moving. Read how we drew it, built it and struck it.
Open the case file/ 05 QUOTE
A written quote inside 24 hours. For anything over three storeys we will visit first.
01632 960431
hello@ledgerline.example
Hemel Hempstead, Hertfordshire