Herringbone 45°
Best for vehicles. 10 to 12 per cent cutting waste.
Most failed driveways fail underneath. Ours are specified from the bottom up: depth, base, bed, then the pattern you actually see. Typical single-drive job: four working days.

The three patterns we lay, drawn at the same scale so you can compare how each one locks.
Best for vehicles. 10 to 12 per cent cutting waste.
Best for pedestrian areas and edging.
Fine for light traffic on straight runs.
Not if the surface is permeable or drains to a lawn or border within the property. We design every drive to do one of the two and tell you in writing.
Straight away on foot. Cars after 24 hours, vans and skips after three days, while the joints finish settling.
Some seed lands in the joints of any paving. A polymeric sand top-up and a yearly sweep keeps it clean.
Usually. Bring a photo and we will bring samples.